Stroomkern – home Load-data analysis

The system

One platform, from 125 kWh to 5 MWh.

Kern 125 cabinets for SMEs and mid-size sites, Kern Block containers for larger industrial and logistics sites. Same energy management system, same monitoring.

Diagram: grid connection, main switchboard, Kern storage cabinets, EV chargers and solar PV, coordinated by the energy management system Gridcontracted kW Switchboard+ meter Kern 125 × n EV Siteload Solar PV EMSreads meter 1×/s
System overview: the EMS keeps grid demand below the contracted capacity.

Specifications

Kern series at a glance

Demonstration values for a fictional product range. A real proposal includes the manufacturer datasheet of the selected system.

Comparison of Kern 125 and Kern Block
ParameterKern 125 cabinetKern Block container
Usable energy125 kWh2,500 kWh
Continuous power62.5 kW1,250 kW
Power / energy ratio0.5C0.5C
Scaling1–8 cabinets (up to 1,000 kWh)1–2 containers (up to 5,000 kWh)
Cell chemistryLithium iron phosphate (LFP)Lithium iron phosphate (LFP)
CoolingLiquid-cooledLiquid-cooled, with HVAC
Grid connection400 V AC, 3-phaseMedium voltage via transformer
Footprint (indicative)1.1 × 1.4 m, outdoor enclosure20 ft container
Fire detectionGas and smoke detection, per cabinetGas, smoke and heat detection, deflagration venting
ControlStroomkern EMS, 1 s meter readingStroomkern EMS, 1 s meter reading
MonitoringRemote portal and monthly reportRemote portal and monthly report

Kern series datasheet
PDF · 2 pages · demonstration document

Site-specific documents
Layout drawing, single-line diagram and safety plan are part of a proposal.

Energy management system

Reads the main meter every second and sets one limit for the whole site. Profiles for peak shaving, solar self-use and back-up can be combined.

Works with your chargers

The EMS can pass a dynamic limit to charge points that support it, so chargers and battery do not compete for the same headroom.

Financing routes

Purchase, lease or a service contract are possible routes. Terms depend on the project and the financing partner; they are not set out on this site.