Atelier VaartAtelier Vaart

Process

Surprises belong on paper, not on site.

A fixed sequence with an approval at every stage. The durations below are indicative ranges from our demonstration projects – your programme is built in the intake.

Printed shop drawings on a timber desk beside a green notebook
  1. 1

    Design intent

    Your interior architect's drawings, or a design we develop with you. We review buildability, material availability and budget before anything is drawn in detail.

    Design and build or build to design – both start here.

    You receive
    Design drawings, finish intentions, budget envelope
    You approve
    Scope and budget direction
    Indicative duration
    2–6 weeks
  2. 2

    Shop drawings

    Every element drawn to the millimetre: construction, materials, fixings, services and interfaces with other trades. Your architect checks them against the design intent.

    Changes after sign-off affect the programme, so this is where questions belong.

    You receive
    Shop drawings and finish schedule
    You approve
    Shop drawings, per element
    Indicative duration
    3–5 weeks
  3. 3

    Mock-up

    A full-size sample of the critical detail – a metre of bar, one banquette bay, or a complete guest room. You touch it, sit on it, clean it.

    For room series, one approved mock-up room sets the standard for all others.

    You receive
    Mock-up and physical samples
    You approve
    Mock-up and final samples
    Indicative duration
    2–3 weeks
  4. 4

    Workshop

    Production, finishing and pre-assembly in our workshop. Elements are numbered and packed per area or per room for installation.

    Long-lead materials (stone, special fabrics) are ordered right after shop drawing sign-off.

    You receive
    Progress updates, workshop visit on request
    You approve
    Optional pre-delivery inspection
    Indicative duration
    6–10 weeks
  5. 5

    Installation

    Installation planned around other trades, or around a venue that stays open: in phases, at night, or room by room.

    We confirm feasibility of phased work per project; we never assume it.

    You receive
    Installation plan, snag list, as-built drawings, maintenance notes
    You approve
    Handover and snag sign-off
    Indicative duration
    1–4 weeks per phase
Glossary

The words we use, explained.

Hospitality owners do not need a construction vocabulary. But it helps to know what is on the table.

Physical material samples laid out on a table for review
Fit-out

Completing the interior of a space so it can open: joinery, finishes, fixed furniture and their coordination with services.

Joinery

Built timber and composite elements – bars, panelling, desks, wardrobes – made in a workshop and installed on site.

Shop drawings

Detailed production drawings made by the builder from the designer's drawings. They show exactly how something will be made.

Mock-up

A full-size physical sample of a detail or a whole room, approved before series production.

FF&E

Furniture, fixtures and equipment: the loose items (chairs, lamps, beds) usually procured separately from fixed joinery. We coordinate with your FF&E supplier.

Live environment

Working in a venue that stays open. It needs phasing, screening, quiet hours and careful logistics.

See the sequence against your date.

The briefing plans these five stages backwards from your opening date, with every assumption shown.