Approach

From the first question to the second site.

A relocatable building has a longer life than its first contract. Our approach covers both: getting the building in use on time, and planning what happens after.

Building frame under construction

Seven phases

What happens, and roughly when.

Durations are indicative ranges for this concept. They depend on the permit procedure, tender procedure and production capacity at the time.

  1. Week 0

    Feasibility call

    Site, programme, term and permit route in one conversation. You leave with an indicative scope and the open questions.

  2. Weeks 1–3

    Programme of requirements

    Classrooms, staff facilities, energy level and indoor-climate ambition, written down so it can serve a tender or a direct award.

  3. Depends on procedure

    Tender or direct award

    For larger contracts most boards and municipalities run a tender. We supply drawings, specifications and planning in the requested format; the procedure determines the timing.

  4. 8–22 weeks

    Permit & engineering

    Drawings and calculations for a temporary or permanent permit, foundation design after a soil survey, and connections to utilities.

  5. Weeks, in parallel

    Production

    Modules are built in the factory while the site is prepared. Inspection moments are agreed in advance.

  6. 2–6 weeks on site

    Assembly & handover

    Foundation, placing, connecting and finishing. Handover with documentation, instruction and a maintenance plan.

  7. Contract term

    Use, extend, relocate

    Maintenance during use. At the end of the term: extend, buy out, add modules, or dismantle and relocate.

Who is involved

Several decision makers, one shared file.

The school board or housing coordinator commissions, the municipality is often responsible for funding and the permit, a procurement adviser runs the tender, and the school director knows how the building will be used. The feasibility summary is written so each of them can read it.

A building under construction at dusk with timber frame visible

Begin at step one.

The feasibility call is free of obligation in this concept – and nothing is sent.