
Core product
Classroom pavilion
2–24 classrooms over 1–3 storeys, with sanitary groups and staff room.
Learn more
Relocatable education buildings in the Netherlands, Belgium and Germany
Factory-built classroom pavilions, decant schools and staff wings, leased or bought. Placed in weeks on site, relocated when the need moves.
When schools call us
Most requests start with one of four situations. Each has its own constraints on timing, permits and contract term – which is why we start with the situation, not the catalogue.
Two to eight extra classrooms on the existing site, often for 3–10 years while the long-term plan is decided.
A complete decant school for the full school population during works, then moved on.
Fire, water damage or structural findings: the first question is what can be in use, and when.
Reception classes or newcomer education with an uncertain duration, where relocation later matters.
Building types

Core product
2–24 classrooms over 1–3 storeys, with sanitary groups and staff room.
Learn more
During renovation
A full temporary school during renovation, including hall and offices.
Learn more
Next to the school
Offices, meeting rooms and staff facilities next to the main building.
Learn more
Plan before you talk
Choose classrooms, storeys, energy level and lease or purchase. The configurator shows an indicative module count, gross floor area and a lead-time range, with every assumption written out. A starting point for a conversation, not a quote.

Lease or buy
Which is cheaper depends on term, energy level and what happens afterwards. The configurator shows both side by side as an illustrative comparison; the feasibility call is where the real numbers are worked out.
Suits a need with a known end, or an end you cannot predict yet. Maintenance can be included; at the end of the term the building is dismantled and relocated or reused. Extending the term is usually possible.
Suits a need for many years or a portfolio of schools. The building stays your asset and can be moved to another site in the same portfolio later. Valuation and relocation cost depend on condition and distance.

Demonstration project
How a fictional primary school board decanted 210 pupils into a two-storey pavilion, and what happens to the modules afterwards.
45 minutes with a project engineer: site, programme, permit route and timing. Bring your configuration or just the question.